Steam Plant – Hill Air Force Base, Utah

Steam Plant – Hill Air Force Base, Utah

For this project, we were hired to excavate the soil underneath an existing building, import structural fill, and shape channels in the grade to prepare for installation of a slab floor with drainage channels. Our client sent us the following letter upon completion of...
Shooting Range at Camp Williams

Shooting Range at Camp Williams

We built a 300m shooting range at Camp Williams for this project. We had to construct a 9-foot fill for this shooting range (above the shoot house). Because of culturally sensitive areas on Camp Williams, you cannot go outside of your work boundary. This was a very...
Sniper Tower – Military Special Project

Sniper Tower – Military Special Project

This Camp Williams Sniper Tower was dug through rock to construct steps in the rock itself. This is necessary so that when we pour their footings, they are poured on a step. Before the concrete contractor can do their work they have to submit a plan to the government....
We Have Military Project Experience

We Have Military Project Experience

This HHI (Army Corps of Engineers) project was multifold, but this photo is of the shoot-house. This project was funded by all of the military branches for Special Forces. Each footing sits at a different elevation, which we achieved using our GPS location, while...