Shooting Range at Camp Williams

Shooting Range at Camp Williams

We built a 300m shooting range at Camp Williams for this project. We had to construct a 9-foot fill for this shooting range (above the shoot house). Because of culturally sensitive areas on Camp Williams, you cannot go outside of your work boundary. This was a very...
Sniper Tower – Military Special Project

Sniper Tower – Military Special Project

This Camp Williams Sniper Tower was dug through rock to construct steps in the rock itself. This is necessary so that when we pour their footings, they are poured on a step. Before the concrete contractor can do their work they have to submit a plan to the government....
We Have Military Project Experience

We Have Military Project Experience

This HHI (Army Corps of Engineers) project was multifold, but this photo is of the shoot-house. This project was funded by all of the military branches for Special Forces. Each footing sits at a different elevation, which we achieved using our GPS location, while...
We have an E100 License

We have an E100 License

Installing RCP (reinforced concrete pipe) storm drain pipe on a public right away requires an E100 license. Here, we are enclosing an open ditch. The pipe had to be installed with precision laser technology as each joint can’t be any greater than a ½” gap. We had to...
Ogden City Engineered Fill

Ogden City Engineered Fill

This was an engineered fill within the parameters of a building pad. The construction of this building pad had to take place 8” at a time because it needs to be completed in a controlled, tested manner.  This particular building pad was a 6,000 sq foot by 4 ft tall...